Terms & Condition.

Price Policy:

Effect Building Co. price includes the allowances to complete the works safely, professionally and to the highest standards, complying with all industry and legislative requirements. We do not compromise on Quality, Health, Safety, Environment, Equipment, Infrastructure or Requirements and we will not take shortcuts or risks on your project.

Quotation validity:

This quotation has been prepared using current Labour & Material rates and shall remain valid for seven (7) days from the date of quotation.

Warranty:

Effect Building Co. will provide a twelve (12) months warranty from the date of quotation acceptance for workmanship and materials.

Payment terms:

A 10% deposit is required, and payment of the balance is required within seven (7) days of the date of final invoice. Any late payment will be subject to fees of 10% of total invoice amount.
Progress payments are required every week as invoiced till the full completion of the project.

Site requirements:

This quotation is issued subject to total uninterrupted access to the works. The client agreed to guarantee the access of restroom facilities during the completion of the work. If the client cannot guarantee this access a $80/day will be applied. All general waste, household furniture, general junk and movable objects to be cleared from site prior to handover of site to EBCO unless clearly specified in scope of works.

Commencement of works:

Work can begin once the deposit is paid and the quote has been accepted. Effect Building Co. will commence the work within five (5) days once receive the deposit and is not liable for any cost, damage, loss or expense arising out of delay or suspension of works.

Continuity of works:

This quotation allows for all works, as specified, to be carried out in one continuous operation. EBCO reserves the right to vary its quoted price should a portion of the scope of works be deleted, altered or rescheduled.

Unanticipated conditions:

The attached quotation allows for the removal of only the materials which have been positively identified in the scope of works of this quotation. Should any further hazardous materials be found during the works, EBCO will be able to issue a further price for the removal of these materials. If during the execution of the works under this contract, EBCO encounter physical conditions on the site or its surroundings which EBCO considers could not reasonably have been anticipated at the date of quotation, then all additional work carried out by EBCO as a result, and any loss Damage or expense incurred as a result of the unanticipated conditions shall be at the client’s expense. No extra works shall be commenced unless authorized in writing by the client as per the rates listed under the ‘variations to work’.

Variations to work:

The price to be paid or the allowance made for variations to the scope of works will be agreed or assessed using the price for labor ($97.50 per man/ per hour for Tradesmen, $125 per man/ per hour for Demolition work) plus the cost of Travel, Living away allowances, Waste Disposal Fees, Materials, Equipment and Consumables plus a margin of 30% to cover administration, overheads and profit. Where day work is required; labour, materials, equipment and consumables will be charged at the above rates and a minimum of 5 hours charge per man will apply.

Quality, WHS and the Environment:

Effect building Co. takes pride in, and job satisfaction from all works it completes, all works are inspected and certified where necessary and all works are completed as per Australian standards and legislative requirements. Effect Building Co. takes pride in being ‘environmentally friendly’ and the quoted price allows for all waste materials to be disposed of responsibly and for various materials to be recycled where possible.

Surface finish:

The site will be clear of all waste, rubbish and debris. Where renovations, strip-outs and refurbishment works are quoted, no allowance is made for the ‘make good’ of any surfaces, penetrations, concrete and masonry openings or any surface or structure once walls, windows, fittings and fixtures are removed. Where the removal of floor, wall and ceiling finishes are quoted; only the visible surface is allowed for removal to a practicable achievable standard and no allowance is made for the removal of any extra layers under the existing surfaces. No allowance is made for the removal of any residual materials including but not limited to glues, grouts, concretes, carpets, underlays, vinyl, paints, tiles, gyprock / plaster, etc. Effect Building Co. will be able to issue a further price for the removal of these stubborn materials.